Concrete Batching Plant for Hydropower Infrastructure in Tibet
Construction date: 8/16/2015
Location: Tibet, China
Mixer model: JS1500 Concrete Mixer
Theoretical productivity: 90m³/h
Application: Hydropower Infrastructure
Project Description
China Water Resources Foundation Bureau of Tibet branch conducted the construction of Ali area Zanda county water supply project, and the total duration of 365 days.
The main work of this project is to build a new water supply of 2000 cubic meters / day, long-term water supply of 3000 cubic meters / day water supplying plant, and the length of the water distribution network is 11.7 km; approved factory building area is 6460 square meters, including business space, pumping station, clear water pool, variable power distribution room and generator room, etc .; and the construction of plant may also contain water supply and drainage, electrical, roads, green, walls, doors and other projects, it also configures automation, disinfection, security, power distribution equipment.
This HZS90 concrete batching plant is installed not far away from the construction site. Two concrete truck from CamelWay helped transport the concrete to the construction site efficiently in time.
Customer's Evaluation
"We have cooperated with CamelWay Machinery for about 8 years in many project, such as bridge, road building, water factory and dams construction. We trust this big manufacturer. (when asked about the products quality) Yes, the new twin shaft concrete mixer has higher efficiency and low power consumption. It is really good,and we will continue to trust products from CamelWay Machinery." Mr. Liu the construction manager of this plant in China Water Resources Foundation Bureau of Tibet branch said.